Software Electrical System Modelled is Modelled in ETAP Software
Codes & Standards Arc Flash study as per IEEE-1584, Arc Flash Study of system along with Fault Calculations
Methodology Fault Analysis and Relay Co-ordination Studies are pre-requisite for performing Arc Flash Studies Calculation of Arc Flash Incident Energy at each Bus depending on the fault current & time of operation of the protective devices
Analysis Results Arc-Flash Incident Energy at working distance (cal/cm2) PPE Category / Glove ratings Arc hazard boundary (inches) Limited approach distance (inches) Restricted approach distance (inches) Recommendation of modification of protection settings wherever required.